Key takeaways
- Reactive, preventive, predictive, and condition-based maintenance are often treated as competing options, but the strongest mining operations run all four at once, matched to what each component actually needs.
- Getting the mix right matters more than picking a “best” strategy. The wrong balance quietly drives up unplanned downtime, maintenance costs, and safety risk.
- Most operations already collect enough condition data to shift that balance. The real barrier is turning readings into action, not gathering more of them.
- This article breaks down what each strategy actually does, where it fits, and how to judge whether your current mix is working, backed by real DINGO case data.
An unplanned failure on a haul truck rarely costs just a component. It costs a shift, a chunk of asset utilisation, increases risk & exposure hours – adding a safety perspective – and sometimes a full production schedule. Yet the terms reactive, preventive, predictive, and condition-based maintenance get used almost interchangeably across the mining industry, by vendors and operators alike, and that confusion around maintenance strategies leads to real investment decisions going the wrong way.
This article sets out a plain definition of each maintenance strategy, where each one genuinely earns its place in a broader asset management program, and how to judge whether your current mix is actually optimising operations. DINGO has spent more than 30 years managing equipment health across the mining sector, now overseeing more than $14 billion of critical machinery and critical equipment across 250-plus operations, so the patterns below are drawn from real maintenance operations, not theory.
Not sure which mix is right for your fleet? Talk to a maintenance specialist
Reactive maintenance: run to failure
Reactive maintenance means no intervention until the asset actually fails. It sounds like a strategy to avoid entirely, but that is not quite right. For low-cost, low-criticality components that are quick and cheap to replace, run-to-failure can come with lower upfront costs than any monitoring program. Monitoring a part that costs less to replace than it does to watch makes little economic sense.
The trouble starts when reactive maintenance creeps into critical assets, safety-critical systems, or components with long lead times. The true cost of an unplanned failure is rarely just the part. It includes lost production, secondary damage to surrounding components, expedited freight on replacement parts, overtime labour, emergency repairs, and, in the worst cases, safety risks to the people working near the equipment. This is the maintenance strategy every operation eventually runs into, and one of its biggest hidden costs is unplanned downtime that ripples well beyond the failed component itself.
DINGO’s own case data illustrates the stakes: a diesel generator at a remote, off-grid African mining operation showed early signs of coolant ingress in a routine oil sample. Left unaddressed, it could have escalated into a full engine failure requiring a rebuild costing more than $736,000. Because the condition was caught early instead of running to failure, the site avoided 744 hours of potential unplanned downtime and completed a planned cylinder-head replacement instead, avoiding both the repair costs and the associated costs of a catastrophic failure.
For assets where availability matters, see how mining solutions shift the balance away from run-to-failure.
Preventive maintenance: fixed intervals
Preventive maintenance services equipment on a schedule, whether that is measured in calendar time, operating hours, or usage intervals, regardless of the component’s actual condition. It exists for good reasons. OEM warranty compliance, regulatory requirements, and the sheer planning simplicity of a fixed maintenance schedule that keeps maintenance operations predictable.
Its core weakness is that it assumes failure is time-based, when most component failures are not tied to equipment usage in a straight line. This produces two failure modes of over-maintenance and under-maintenance at once. Components get replaced with plenty of equipment life left on the table, driving unnecessary maintenance and unnecessary costs, while others fail unexpectedly between scheduled intervals anyway. There is also a lesser-known risk called infant mortality, where performing maintenance on a healthy machine, opening it up, disturbing seals, introduces new risk rather than removing it.
DINGO’s benchmarking across mining fleets consistently shows meaningful component life left unused when parts are swapped on a fixed interval rather than on actual condition, which is one reason operations that shift toward condition-based decisions typically see double-digit gains in equipment life and more predictable maintenance costs. For scheduled inspection routines built around real equipment usage rather than the calendar, see Inspections.
Condition-based maintenance: act on what the asset is telling you
Condition-based maintenance relies on a measured condition crossing a defined threshold to trigger the work, such as oil analysis, vibration analysis, thermal monitoring, or wear debris. The critical distinction from predictive maintenance is timing. Condition-based maintenance responds to a condition that exists right now, through continuous monitoring and real-time data, not a forecast of what is coming.
It requires reliable data collection, sensible alarm limits, and a workflow that turns a reading into an actual work order rather than a report nobody opens. Done well, it consistently beats interval-based work on cost per operating hour and helps minimise costs across the fleet, because parts are touched only when the evidence says they need it. Its main limitation is that threshold-crossing can still leave a short planning window once the alarm fires, which is where predictive tools pick up the slack.
The 744-hour generator save above is a clean example of condition-based maintenance in action. A trace of coolant in an oil sample was flagged, reviewed and validated by DINGO’s Condition Intelligence analysts, and turned into a scheduled repair before it became a production-stopping event. For more on how that validation layer works, see Condition Intelligence.
Predictive maintenance: forecast the failure, plan the fix
Predictive maintenance technologies go a step further than condition monitoring alone. They combine condition data with machine learning, analytics, and historical failure patterns to estimate when a component is likely to fail, creating a genuine planning window rather than a same-day alarm. The output that matters is not the alert itself but an estimate of remaining useful life and a recommended action, which lets maintenance teams schedule the fix into an existing maintenance window instead of creating a new one and driving further equipment downtime.
Effective predictive maintenance strategies depend on a strong history of operational data, cross-fleet benchmarking, and integration into the site’s computerised maintenance management system (CMMS) or ERP so that recommendations become work orders automatically rather than sitting in an inbox. A prediction is also only as good as the data behind it, and it still needs a person to act on it, which is why continuous improvement of the underlying process matters as much as the predictive systems themselves.
One of the clearest examples is a remote gold mine in Oceania that went live with DINGO’s Trakka® software in December 2024. The first breakdown avoidance was detected just 35 days after go-live. Within months, the site had avoided more than $3.1 million in breakdown-related costs, including a single save on a CAT 6060 hydraulic shovel where predictive analytics flagged a component with a 100 per cent assessed likelihood of failure, preventing 60 hours of downtime worth over $1 million in production losses. Components in critical condition across the fleet dropped from 18 per cent to 2.21 per cent over the same period, a clear sign of improving equipment health. Across DINGO’s customer base more broadly, predictive maintenance programs typically deliver a 3:1 return with payback in six months or less. Explore Trakka predictive maintenance software or read more customer stories.
Side-by-side: how the four compare
| Strategy | Trigger | Data required | Planning window | Best suited to | Main risk |
|---|---|---|---|---|---|
| Reactive | Asset failure | None | None | Low-cost, low-criticality, easily replaced parts | Secondary damage, safety risks |
| Preventive | Fixed interval (time, hours, cycles) | OEM schedules, usage intervals | Fixed and scheduled | Warranty and regulatory compliance | Wasted equipment life, or failure between intervals |
| Condition-based | Condition crosses a threshold | Oil analysis, vibration analysis, thermal monitoring | Short, once triggered | Critical assets with clear failure signatures | Limited lead time to plan the fix |
| Predictive | Forecasted remaining useful life | Historical data plus analytics and machine learning | Extended, built ahead of failure | Critical machinery with strong data history | Forecast quality depends on data quality |
Mature maintenance operations do not pick one of these four strategies and abandon the rest. They run all four deliberately, assigning each to a component based on equipment criticality and failure behaviour, not on which one is currently fashionable, to optimise resource allocation across the whole fleet. See how these strategies work together under DINGO’s asset management solutions.
Where operations get this wrong
This is the honest part most articles on this topic skip. Most mining operations do not actually have a condition monitoring problem. They have an action problem. Data collection is happening, alarms fire, and nothing gets actioned because the volume of operational data outpaces the time available to review it, undermining what should be a proactive approach.
Alarm fatigue compounds this. When a system generates too many false positives, maintenance teams stop responding to it, and the genuine warning that points to future failures gets missed along with the noise. Buying more sensors or another monitoring platform without changing the underlying workflow simply produces more reports nobody reads and does nothing to prevent equipment failures.
The fix is process and accountability, not more hardware. A well-tuned alarm regime, backed by analyst review that filters noise before it ever reaches a planner, is what turns condition data into completed maintenance activities rather than an ignored dashboard, and what ultimately drives down maintenance costs. See how intelligence supports that review layer.
Choosing the right mix for your operation
Four questions worth answering honestly today:
- Which components genuinely sit on your critical path, and how well do you understand their equipment criticality?
- What condition data are you already collecting but not acting on?
- What proportion of your maintenance tasks are currently unplanned? (Operations without a structured preventive maintenance program commonly have unplanned work take up 30 to 50 per cent of total maintenance hours.)
- Do your condition alarms flow automatically into work orders, or does someone have to manually notice and action them?
The direction of travel matters more than a perfect starting point. Shift the ratio of planned to unplanned work, one asset class at a time, to steadily reduce unplanned downtime and build predictable maintenance costs into the budget. For a deeper primer, see the Basic Guide to Predictive Maintenance.
—
Reactive, preventive, predictive, and condition-based maintenance are not four options to choose between. They are four tools to assign correctly, matched to what each component actually needs to keep equipment performance high and asset management costs under control. For most operations, the biggest gains will not come from buying new sensors. They will come from the operational data already sitting in the business, waiting to be acted on.
Ready to see where your fleet’s mix stands today? Talk to a maintenance specialist